In this PHMSA cofunded project, TransCanada Pipelines, Chevron and Gaz de France, the Pipeline Research Council International, Inc. (PRCI) will work with NOVA Research & Technology Centre to complement and build upon existing SCC DA procedures to better identify potential SCC sites for direct examination and to predict how frequently such inspections should be made.
The primary objective of this research is to develop a set of flexible, adaptable, non-prescriptive and quantitative guidelines for predicting where and when SCC might be an integrity threat for gas and liquid hydrocarbon pipelines. The guidelines will allow more-informed estimation of the re-inspection interval for repeat Direct Assessment (DA) procedures. These guidelines will be designed to:
The broad technical tasks involved in the study include: operating company data collection, analysis of this data, documentation of the effort and results, and technology transfer to industry.