EC-6-4: The Impact of Fluctuations in AC Interference on the Corrosion Risk for Buried Pipelines
The objective of paper is to study the effect of fluctuating AC interference phenomenon (AC interference time duration and level of AC interferences) on the corrosion risk of pipelines. This fluctuation typically represents the actual condition experienced by the pipeline but is not entirely captured or discussed in current guidelines or standards. (EC-6-4)